TM 1-1520-238-23
1-256
1.77.
MOORING PAVED SURFACE
1.77.1. Description
This task covers:
Mooring.
1.77.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Aircraft mooring tiedown kit (item 362, App H)
Tension adjuster assembly (item 26, App H)
Single leg chain assembly (item 62, App H)
Personnel Required:
67R
Attack Helicopter Repairer
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.2
Access doors L115 and R115 opened
1.61
Brakes locked
1.59
Protective covering installed
1.106
Main rotor blades tiedown installed
1.77.3. Mooring
a. Position aircraft on mooring pad.
(1) Position the aircraft on the mooring pad with
the longitudinal centerline of the aircraft di-
rectly above and parallel to the longitudinal
axis of the pad (1).
(2) Position the forward mooring rings (2), lo-
cated on the main landing gear struts, directly
in line laterally with the forward mooring
points (3) on the pad (1).
GO TO NEXT PAGE
M04-3667-1
1
M04-3667-2
2
3