TM 1-1520-238-23
1-324
Change 8
1.107.
MAIN ROTOR BLADES TIEDOWN REMOVAL continued
b. Remove main rotor blade tiedown (5).
(1) Extend tiedown pole (6). Attach pole (6) to
tiedown bracket (7).
(2) Rotate tiedown pole lock (8) to maintain ex-
tension.
(3) Hold tiedown rope (1) to stabilize tiedown (5).
(4) Remove tiedown (5) from end of rotor blade
(9).
(5) Remove pole (6) from tiedown bracket (7).
(6) Repeat steps b.(1) thru b.(5) for other three
rotor blades.
c. Stow pole (6) and tiedown (5) in flyaway kit in
aft stowage bay.
END OF TASK
M04-2106-2
5
9
7
1
6
8
All data on page 1-325 including Paragraph 1.108 deleted.