TM 1-1520-238-23
3-33
3.10.
MAIN LANDING GEAR WHEEL TAPERED CONE AND ROLLERS REMOVAL/INSTALLATION
(NINE-BOLTS) continued
3.10.6. Installation
a. Grease rollers (3) and (8) (para 3.15).
b. Coat cups (4) and (9), and new gaskets (2) and
(7) with grease. Use grease (item 87, App F).
c. Install roller (8) and new gasket (7) in cup (9)
of wheel (5).
(1) Position roller (8) in cup (9).
(2) Install gasket (7) in cup (9). Ensure edge of
gasket (7) is facing roller (8).
(3) Press gasket (7) in place with hand pressure.
(4) Install snap ring (6).
d. Install roller (3) and new gasket (2) in cup (4)
of wheel (5).
(1) Position roller (3) in cup (4).
(2) Install gasket (2) in cup (4). Ensure edge of
gasket (2) is facing roller (3).
(3) Press gasket (2) in place with hand pressure.
(4) Install retaining ring (1).
e. Inspect (QA).
f. Install main landing gear wheel and tire (para
3.6).
END OF TASK
M04-051-2
1
2
3
4
8
7
6
9
5