TM 1-1520-238-23
4-406
4.128.
NO. 1 AND NO. 2 ENGINE SECONDARY NOZZLE SUPPORT BUSHING REPLACEMENT
(AVIM) continued
4.128.4. Cleaning
a. Clean flange (para 1.47).
4.128.5. Inspection
a. Check flange and nozzle body for cracks and
burning. None allowed.
b. Check flange and body for corrosion (para
1.49).
4.128.6. Installation
a. Install new bushing (1) on flange (2).
(1) Position bushing (1) on flange (2).
(2) Install rivets (3) (TM 1-1500-204-23).
b. Inspect (QA).
END OF TASK
M04-2617-2
2
1
3