TM 1-1520-238-23
4-462
4.144.
NO. 2 ENGINE LOAD DEMAND SPINDLE GEARBOX REMOVAL/INSTALLATION continued
d. Perform No. 2 engine load demand spindle rigging check (para 4.184).
e. Perform power plants maintenance operational check (engine 1) (TM 1-1520-238-T).
f. Install engine shroud (para 4.55).
g. Secure access door RN1 (para 2.2).
END OF TASK