NO. 2 ENGINE POWER AVAILABLE SPINDLE CENTER CABLE INSTALLATION continued
4.148.3. Installation
a. Check cable ribbon (1) friction load.
(1) Place cable (2) on flat surface. Ensure cable
(2) is not bent or twisted.
(2) Slide ribbon (1) 2.5 INCHES in and out of
cable (2). There should be no binding, stiff-
ness, or jamming.
(3) Check friction load of ribbon (1). Load not to
exceed 1.5 POUNDS. Use scale.
(4) If ribbon movement is rough or friction load
exceeds 1.5 POUNDS, replace cable.
b. Install threaded end of center cable (2)
through hole (3) in forward left transmission
deck (4).
c. Install cable (2) through seal (5) on pilot sta-
tion bulkhead.