TM 1-1520-238-23
4-511
4.154.
ENGINE LOAD DEMAND SPINDLE BELLCRANK REMOVAL/INSTALLATION continued
4.154.4. Cleaning
a. Clean removed and attaching parts (para
1.47).
4.154.5. Inspection
a. Check removed and attaching parts for
cracks. None allowed.
b. Check removed and attaching parts for corro-
sion (para 1.49).
4.154.6. Installation
a. Install bellcrank (2) on support (17). Torque nut
(20) 65 to 80 INCH-POUNDS.
(1) Position bellcrank (2) in support (17).
(2) Install bolt (19) through support (17) and bell-
crank (2).
(3) Install nut (20) on bolt (19). Torque nut (20) to
65 INCH-POUNDS. Use torque wrench.
(4) Increase torque to aline cotter pin hole, but do
not exceed 80 INCH-POUNDS.
(5) Install new cotter pin (18).
GO TO NEXT PAGE
M04-2317-7
19
2
20
18
17