TM 1-1520-238-23
4-555
4.165.
NO. 1 OR NO. 2 POWER AVAILABLE SPINDLE CABLE CONNECTING LINKS
DISASSEMBLY/ASSEMBLY continued
4.165.5. Inspection
a. Check rod for cracks or damaged threads.
None allowed.
b. Check rod ends for damaged threads. None
allowed.
4.165.6. Assembly
NOTE
Jamnuts should be finger tight only. Final
adjustment and torquing of rod ends and
lockwire will be performed during rigging.
a. Install rod end (4) on link (2).
(1) Install jamnut (5) on rod end (4).
(2) Install rod end (4) 0.50 INCHES in link (2).
b. Install rod end (1) on link (2).
(1) Install jamnut (3) on rod end (1).
(2) Install rod end (1) 0.50 INCHES in link (2).
c. Inspect (QA).
d. Install No. 1 or No. 2 power available spindle
cable connecting link (para 4.164).
END OF TASK
M04-3935-2
0.50 IN
4
5
2
3
1