TM 1-1520-238-23
4-658
Change 1
4.183.
NO. 2 ENGINE POWER AVAILABLE SPINDLE (PAS) RIGGING PROCEDURE continued
u. In pilot station, remove rig pin (8) from bracket
(9) and bellcranks (11) and (10).
v. Remove rig pin (20) from gearbox (18).
w. Install cable rod end (24) on bellcrank (11).
Torque nut (27) 14 to 18 INCH-POUNDS.
(1) Position rod end (24) in bellcrank (11).
(2) Install bolt (26) through bellcrank (11) and rod
end (24).
(3) Check fit of self-retaining bolt (26) (para
11.1).
(4) Hold bolt (26). Install nut (27). Torque nut (27)
to 14 INCH-POUNDS. Use torque wrench.
(5) Increase torque to aline cotter pin hole, but do
not exceed 18 INCH-POUNDS.
(6) Install new cotter pin (25).
GO TO NEXT PAGE
10
M04-1208-45
11
8
9
M04-1208-26
18
20
M04-1208-58
11
25
27
24
29
26