TM 1-1520-238-23
4-723
4.196.
CPG POWER QUADRANT NO. 1 ENGINE OUT DISABLE SWITCH REMOVAL/INSTALLATION
(AVIM) continued
4.196.6. Installation
a. Install switch (8) in power quadrant (9).
(1) Install wires of switch (8) through grommet
(16) in shaft support plate (17).
(2) Apply sealing compound to threads of two
screws (15). Use sealing compound
(item 172, App F)
(3) Install two screws (15) through washers (14),
plate (17), spacer (13), switch actuator (12),
switch (8), lockwashers (11), and locknuts
(10). Do not tighten locknuts (10).
b. Adjust switch (8).
(1) Set power lever (18) to FLY.
(2) Adjust switch (8) so actuator (12) is fully de-
pressed.
(3) Move power lever (18) back from FLY, ensure
switch (8) is in open position.
c. Tighten two locknuts (10).
GO TO NEXT PAGE
8
12
19
15
14
17
13
1110
15
9
10
18
8
17
M04-3341-4
16
M04-3341-5
18
8
12
15
10