TM 1-1520-238-23
16-96
Change 8
16.20.
PYLON FRAME STRAIGHT PIN REPLACEMENT - continued
16.20.4. Cleaning
a. Wipe pin mounting area with a clean rag.
16.20.5. Inspection
a. Check pin mounting area for cracks. None al-
lowed. Use magnifier. If cracks are suspected,
perform
nondestructive
inspection
(TM 1-1520-264-23). Replace pylon frame if
cracked (para 16.22).
16.20.6. Installation
a. Install pin (1) in pylon frame (2). Torque bolt (3)
to 70 INCH-POUNDS.
(1) Install new pin (1) in hole.
(2) Install bolt (3) and washer (4).
(3) Torque bolt (3) to 70 INCH-POUNDS. Use
torque wrench.
b. Inspect (QA).
c. Install pylon actuator and top plate (para 16.9).
d. Install pylon controller and controller bracket
(para 16.15).
END OF TASK
M04-2846-4
= Inspection area
M04-2846-3
3
4
1
2