TM 1-1520-238-23
16-110
Change 8
16.25.
PYLON RACK BUSHING REPLACEMENT - continued
b. Install rod end (7) in yoke (2). Torque nut (5) 285
to 500 INCH POUNDS.
(1) Aline rod end (7) with yoke (2).
(2) Install bolt (4) through yoke (2), rod end (7),
washer (6), and nut (5).
(3) Hold bolt (4). Torque nut (5) to 285 INCH-
POUNDS. Use torque wrench.
(4) Increase torque to aline cotter pin holes, but
do not exceed 500 INCH-POUNDS.
(5) Install new cotter pin (3).
c. Inspect (QA).
d. Install pylon rack ejector impulse cartridge
(para 16.3).
e. Perform external stores elevation control
maintenance
operational
check
(TM 1-1520-238-T).
f. Perform
pylon
boresighting
(TM 9-1230-476-20-1).
END OF TASK
M04-2666-5
7
5
6
3
4
2