TM 1-1520-238-23
1-204
1.59.
PROTECTIVE COVER INSTALLATION
1.59.1. Description
This task covers:
Installation.
1.59.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Aircraft mooring tiedown kit (item 363, App H)
Personnel Required:
67R
Attack Helicopter Repairer
Two persons to assist
References:
TM 1-5855-265-20
TM 1-1270-476-20
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.2
Access doors T250L, T250R, T290L,
T290R, L325, and L330 opened
GO TO NEXT PAGE