TM 1-1520-238-23
Change 8
2-390.1
2.107.
VERTICAL STABILIZER REMOVAL/INSTALLATION continued
f. Perform electrical bond check between left
forward stabilizer lug and right aft tailboom
pad (TM 55-1500-323-24).
(1) Bond shall be 0.1 OHM or less. Use
ohmmeter.
g. Perform electrical bond check between right
forward stabilizer lug and left aft tailboom pad
(TM 55-1500-323-24).
(1) Bond shall be 0.1 OHM or less. Use
ohmmeter.
NOTE
If bond check exceeds 0.1 OHM, re-
move vertical stabilizer and repeat
steps a. thru g.
Step h. only applies to aircraft with
non-elastomeric mounts.
h. Seal junction of lug (23) and pad (24). Use
sealing compound (item 176, App F).
i. Remove sling (15) from stabilizer (16).
(1) Unlock and remove four sling quick-release
pins (17) from pin sockets (18).
(2) Remove sling lifting eye (20) from crane hook
(19).
GO TO NEXT PAGE
M04-2990-22
16
18
17
15
19
20
M04-2990-13A