TM 1-1520-238-23
2-680
2.191.
SENSOR SURVEYING UNIT (SSU) MOUNT REMOVAL/INSTALLATION continued
b. Remove sensor surveying unit mount (1) from
bracket (2).
(1) Hold screw (3). Remove nut (4) and washer
(5) from bracket (2).
(2) Remove screw (3) and washer (6) from
mount (1) and bracket (2).
c. Remove left strut assemblies (7) and (8) from
two brackets (9).
(1) Hold two screws (10). Remove nuts (11) and
washers (12).
(2) Remove two screws (10) and washers (13)
from brackets (9).
(3) Remove struts (7) and (8) from brackets (9).
d. Remove right strut assembly (14) and struc-
tural support (15) from two brackets (16).
(1) Hold two screws (17). Remove nuts (18) and
washers (19).
(2) Remove two screws (17) and washers (20)
from brackets (16).
(3) Remove strut (14) and support (15) from
brackets (16).
e. Remove mount (1) from CPG station.
2.191.4. Cleaning
a. Wipe removed and attaching parts and sur-
faces with a clean rag.
2.191.5. Inspection
a. Check struts, support, and brackets for dam-
age (para 2.11).
GO TO NEXT PAGE
M04-2127-3
11
12
9
13
10
6
11
12
4
13
10
9
2
7
3
1
8
5
17
20
19
18
16
17
20
19
18
15
M04-2127-4
16
14