4.5.
NO. 1 ENGINE REMOVAL UPPER DISCONNECTION continued
f. Remove load demand cable assembly (20)
from load demand spindle gearbox (21).
(1) Hold cable housing flats (22). Remove cou-
pling nut (23).
(2) Pull cable (24) inboard and remove.
g. Remove power available cable assembly (25)
from power available spindle gearbox (26).
(1) Hold cable housing flats (27). Remove cou-
pling nut (28).
(2) Pull cable (29) inboard and remove.
h. Stow power available cable (25) in upper clip
(30).
i. Stow load demand cable (20) in lower clip (31).
j. Remove coupling (32) from primary nozzle
(33).
(1) Loosen lower clamp nut (34).
(2) Remove upper clamp nut (35).
(3) Slide coupling (32) aft off nozzle (33) until it
clears engine flange (36).
k. Remove air duct (37) from nozzle (33).
(1) Remove three screws (38) and washers (39).
l. Move nozzle (33) aft until it clears flange (36).