TM 1-1520-238-23
4-140
Change 9
4.43.
ENGINE BUILDUP NO. 2 ENGINE WIRING INSTALLATION continued
M0413602A
3
4
2
1
4.43.3. Installation
a. Place wire harness (1) under engine (2) with
firewall connectors P22 (3) and P24 (4) on left
side of engine (2).
b. Attach connector P40 (5) to air regulator valve
receptacle L4 (6).
(1) Lockwire connector (5) to receptacle (6). Use
wire (item 221, App F).
c. Attach connector P36 (7) to starter receptacle
A4 (8).
d. Attach connector P34 (9) to anti-ice valve re-
ceptacle L2 (10).
e. Attach connector P953 (11) to temperature
switch receptacle S126 (12).
GO TO NEXT PAGE
6
5
8
7
M0413603
M0413605
10
9
12
11