TM 1-1520-238-23
4-421
4.133.
SECONDARY NOZZLE FRAME REMOVAL/INSTALLATION continued
(6) Reposition frame (1) in arbor press (8).
(7) Aline new bushing (6), flange up, with press
ram (9) and hole in nozzle frame (1).
(8) Press bushing (6) in nozzle frame (1). Apply
steady pressure until bushing (6) bottoms in
frame (1).
b. Install nutplate (5) on frame (1) .
(1) Position nutplate (5) on frame (1).
(2) Install two rivets (7) through nutplate (5) and
frame (1) (TM 1-1500-204-23).
c. Inspect (QA).
4.133.7. Installation
a. Install frame (1) on secondary nozzle (2).
(1) Aline holes of frame (1) with holes in nozzle
(2).
(2) Install four pin rivets (4) through frame (1) and
nozzle (2).
(3) Install four pin collars (3) on pin rivets (4),
(TM 1-1500-204-23).
b. Inspect (QA).
c. Install No. 1 or No. 2 engine secondary nozzle
horizontal heat shield (para 4.130).
d. Install No. 1 or No. 2 engine secondary nozzle
vertical heat shield (para 4.129).
END OF TASK
M04-3442-4
1
5
9
6
8
7
M04-3442-5
2
1
3
4
