TM 1-1520-238-23
5-132
5.26.
MAIN ROTOR PITCH HOUSING INSTALLATION continued
(4) Wrap a tie strap around the two leads (18),
over the insulation sleeving, and pull it finger
tight. Use strap (item 191, App F).
g. Perform electrical bond check on electrical
leads (18) (TM 55-1500-323-24).
(1) Bond shall be 1.00 OHM or less. Use
multimeter.
CAUTION
Convoluted covering on wire harness is
fragile. Do not bend or crush while instal-
ling clamps.
h. Install clamp (26) and harness (27) on bracket
(12).
(1) Position clamp (26) on harness (27).
(2) Install bolt (28) through washer (29), clamp
(26), and bracket (12).
i. Install three clamps (26) and harness (27) on
pitch housing (1).
(1) Position clamp (26) on harness (27).
(2) Install bolt (30) through washer (31), clamp
(26), and pitch housing (1).
(3) Install washer (32) and nut (33) on bolt (30).
j. Inspect (QA).
k. Install main rotor blade pitch link (para 11.14).
l. Install main rotor lead lag link (para 5.33).
m. Install main rotor dampers (para 5.23).
n. Install main rotor blade (para 5.4).
END OF TASK
M04-237-6
28
29
27
26
12
18
1
32
26
27
31
30
M04-237-7
33