TM 1-1520-238-23
8-79
8.30.
PILOT/CPG AIRSPEED INDICATOR REMOVAL/INSTALLATION continued
8.30.6. Installation
a. Install indicator (1) in panel (2).
(1) Attach connector P119 (pilot)/P125 (CPG)
(10) to receptacle (M19)J1 (pilot)/(M24)J1
(CPG) (11).
(2) Install line (7).
(a) Hold fitting (8). Use box and open
wrench. Install nut (9). Use box and open
wrench.
(3) Install line (4).
(a) Hold fitting (5). Use box and open
wrench. Install nut (6). Use box and open
wrench.
(4) Aline indicator (1) with screw holes in panel
(2).
(5) Install four screws (3).
b. Inspect (QA).
c. Perform flight instruments maintenance op-
erational check (TM 1-1520-238-T).
END OF TASK
2
11
1
5
M04-167-5
10
7
9
6
4
8
2
3
1
M04-167-6