Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
PILOT/CPG VERTICAL SPEED INDICATOR REMOVAL/INSTALLATION continued - TM-1-1520-238-23-5_098
PILOT ACCELEROMETER REMOVAL/INSTALLATION
TM-1-1520-238-23-5 Helicopter Attack AH-64A Apache (NSN 1520-01-106-9519) (EIC: RHA) Manual
Page Navigation
77
78
79
80
81
82
83
84
85
86
87
TM 1-1520-238-23
Change 1 8-85
8.32.
PILOT/CPG VERTICAL SPEED INDICATOR REMOVAL/INSTALLATION – continued
8.32.6.
Installation
a.
Install indicator (1) in panel (2).
(1) Attach connector P126 (pilot)/P120 (CPG) (6)
to receptacle (M25)J1 (pilot)/(M20)J1 (CPG)
(7).
(2) Install nut (4) on fitting (5).
(a) Hold fitting (5). Use box and open
wrench. Install nut (4) on fitting (5). Use
box and open wrench.
(3) Aline indicator (1) with screw holes in panel
(2).
(4) Install three screws (3).
b.
Inspect (QA).
c.
Perform flight instruments maintenance op-
erational check
(TM 1-1520-238-T)
.
END OF TASK
6
7
1
2
5
4
M04-175-5
M04-175-6
3
1
2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business