TM 1-1520-238-23
Change 1 8-85
8.32.
PILOT/CPG VERTICAL SPEED INDICATOR REMOVAL/INSTALLATION continued
8.32.6. Installation
a. Install indicator (1) in panel (2).
(1) Attach connector P126 (pilot)/P120 (CPG) (6)
to receptacle (M25)J1 (pilot)/(M20)J1 (CPG)
(7).
(2) Install nut (4) on fitting (5).
(a) Hold fitting (5). Use box and open
wrench. Install nut (4) on fitting (5). Use
box and open wrench.
(3) Aline indicator (1) with screw holes in panel
(2).
(4) Install three screws (3).
b. Inspect (QA).
c. Perform flight instruments maintenance op-
erational check (TM 1-1520-238-T).
END OF TASK
6
7
1
2
5
4
M04-175-5
M04-175-6
3
1
2