TM 1-1520-238-23
9-549
9.143.
DATA LINK TERMINATION UNIT (DLTU) (RIGHT FORWARD CATWALK AREA)
REPLACEMENT
9.143.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.143.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
1 1/4-inch blade putty knife (item 199, App H)
Ohmmeter (item 218, App H)
Adjustable air filtering respirator (item 262, App H)
Materials/Parts:
Brush (item 34, App F)
Insulating compound kit (item 97, App F)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 9-1230-476-20-2
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.2
Access doors T250L, T250R, T290L,
T290R, and L325 opened
NOTE
This task is typical for DLTUs T26, T28,
T30, and T32.
9.143.3. Removal
a. Enter CPG station (para 1.56). Observe all
safety precautions.
b. On CPG circuit breaker panel No. 1, open
seven MUX circuit breakers.
GO TO NEXT PAGE
M04-3071-1