TM 1-1520-238-23
12-166
12.53.
CPG AUXILIARY PANEL ASSEMBLY REMOVAL/INSTALLATION
12.53.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
12.53.2. Initial Setup
Tools:
Electrical tool kit (item 378, App H)
Personnel Required:
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 1-1520-238-T
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
12.53.3. Removal
a. Enter pilot station (para 1.56). Observe all
safety precautions.
b. On pilot forward circuit breaker panel, open
AIR DATA DC circuit breaker.
c. On pilot center circuit breaker panel, open LT
PRI circuit breaker.
d. On pilot aft circuit breaker panel, open ECS
CAB, WSHLD WPR, and CANOPY ANTI-ICE
CONTR circuit breakers.
e. Enter CPG station (para 1.56). Observe all
safety precautions.
f. Remove CPG auxiliary panel (1) from console
(2).
(1) Unlock four turnlock fasteners (3).
(2) Remove panel (1) from console (2).
GO TO NEXT PAGE
CPG STATION
M04-2693-1
2
1
M04-2693-2
3