TM 1-1520-238-MTF
2-26
PROCEDURE
TROUBLESHOOTING
REFERENCE
AFTER STARTING APU (CONT)
*e. Ice-detector Have crewmember
touch tip. Verify ice severity meter
needle movement, ENG ICE cau-
tion/warning segment illuminated,
and detector heated. Release de-
tector and verify ENG ICE caution/
warning segment extinguished in
approximately 90 seconds.
*f. PITOT-AD SNSR anti-ice system
Test as follows:
(1) ANTI-ICE panel PITOT AD
SNSR and ENG INLET
switches ON. Verify ENG 1
ANTI ICE and ENG 2 ANTI ICE
caution/warning segments illu-
minate.
(2) Have crewmember touch pitot
tubes and nose gearbox
fairings to verify heating.
(3) ADSS switch OFF. Have
crewmember touch sensor and
verify heating.
(4) Ice detector unit Have crew
member verify presence of PAS
air and that the exterior housing
is heated.
(5) Set pilot and CPG switches as
desired.
A12