TM 1-1520-238-23
4-395
4.124.
NO. 1 AND NO. 2 ENGINE SECONDARY NOZZLE UPPER SUPPORT STRUT AND CLEVIS
REMOVAL/INSTALLATION
4.124.1. Description
This task covers:
Removal. Cleaning. Inspection. Repair. Installation.
4.124.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Materials/Parts:
Cotter Pin
Wire (item 226, App F)
Personnel Required:
67R
Attack Helicopter Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
NOTE
This task is typical for No. 1 or No. 2
secondary nozzle upper support strut.
4.124.3. Removal
a. Remove secondary nozzle upper support
strut (1) from fairing (2).
(1) Remove and discard cotter pin (3).
(2) Remove washer (4) and pin (5) from clevis (6)
and lug (7).
b. Remove strut (1) from struts (8) and (9) and
nozzle (10).
(1) Remove bolt (11) and washer (12).
GO TO NEXT PAGE
M04-2612-1
M04-2612-2
5
6
4
3
2
8
10
9
11
12
7
1