TM 1-1520-238-23
4-460
4.144.
NO. 2 ENGINE LOAD DEMAND SPINDLE GEARBOX REMOVAL/INSTALLATION continued
d. Remove cable (3) from load demand spindle
gearbox (4).
(1) Hold cable flats (5). Remove coupling nut (6).
(2) Remove cable fitting (7) from gearbox fitting
(8).
e. Remove gearbox (4) from baseplate (9).
(1) Remove bolt (10), two flat washers (11), and
countersunk washer (12).
(2) Remove bolts (13) and (14), two flat washers
(15), and two countersunk washers (16).
(3) Remove gearbox (4).
4.144.4. Cleaning
a. Clean baseplate (para 1.47).
4.144.5. Inspection
a. Check cable for cracked, bent, or loose fitting.
None allowed.
b. Check cable for binding. None allowed.
c. Check cable fitting and exposed baseplate for
corrosion (para 1.49).
d. Check baseplate for nicks and scratches.
Maximum depth not to exceed 0.015 INCH.
e. Check splines for visible nicks or wear. None
allowed.
GO TO NEXT PAGE
M04-1181-1
3
6
4
7
8
5
M04-1181-3
M04-1181-4
4
9
13
16
16
14
1012
15
11
15