TM 1-1520-238-23
11-850
11.191.
ASE PANEL REMOVAL/INSTALLATION continued
e. Detach connector P170 (4) from receptacle
(A137)J1 (5). Use socket head key set.
11.191.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
11.191.5. Inspection
a. Check removed and attaching parts for dam-
age (para 11.190).
b. Check removed and attaching parts for corro-
sion (para 1.49).
11.191.6. Installation
a. Attach connector P170 (4) to receptacle
(A137)J1 (5). Use socket head key set.
b. Install ASE panel (1).
(1) Position panel (1) in console (3).
(2) Lock four turnlock fasteners (2).
c. Place PNVS switch in OFF position.
d. Inspect (QA).
e. Perform DASE maintenance operational
check (TM 1-1520-238-T).
END OF TASK
M04-1747-3
4
5
M04-1747-4
4
5
1
2
M04-1747-5
3