TB1--1520--238--20--104
(a) Total of 1.0 man--hours using 1 person.
(b) Total of 1 hour downtime for one end item.
(2) To conduct the correction procedures--
(a) Total of 8.0 man--hours using 2 persons.
(b) Total of 4.0 hours of downtime for one end item.
c.
Estimated Cost Impact of Stock Fund Items to the Field.
(1) For inspection IAW 8a. N/A.
(2) For inspection IAW 8b--
Nomenclature
Part Number
QTY.
Cost Each
Total Cost
Forward Hanger Bearing
7--311350008--3/--5
1
$ 5,954.00
$ 5,954.00
AFT Hanger Bearing
7--211340007--3/--5
1
$ 4,146.00
$ 4,146.00
Total Cost Per Aircraft = $ 10,100.00
d. TB/MWOs to Be Applied Prior to or Concurrently with this Inspection. N/A.
e. Publications Which Require Change as a Result of This Inspection.-- The following publications shall
be changed to reflect this TB, A copy of this TB shall be inserted in the appropriate TM as authority to imple-
ment the change until printed change is received.
(1) TM 1--1520--238--23.
(2) TM 1--1520--238--PM.
(3) Longbow IETM.
13. References
a. TM 1--1520--238--23, Aviation Unit and Intermediate Maintenance Manual for AH--64A Apache At-
tack Helicopter, 16 May 94.
b. TM 1--1520--238--PM, Phased Maintenance Manual for AH--64A Apache Attack Helicopter, 30 June
94.
c. Interactive Electronic Technical Manual (IETM): TM 1--1520--Longbow/Apache IETM, CD No. 1,
Version 3.1.2, Data 19 Nov 98, CD Date 1 Dec 98 or subsequent.
14. Recording and Reporting Requirements.
a. Upon entering requirements of this TB on DA Form 2408-13-1 on all subject MDS aircraft, forward
a priority message, datafax or e-mail to Commander, AMCOM, ATTN: AMSAM-SF-A (SOF Compliance Offi-
cer), Redstone Arsenal, AL 35898--5000 IAW AR 95-1. datafax number is DSN 897-2111 or commercial (256)
313-2111. E-Mail address is "safeadms@redstone.army.mil". The report will cite this TB number, date of
entry in DA Form 2408-13-1, the aircraft mission design series, and serial numbers of aircraft in numerical
order.
b. Task/Inspection reporting suspense date (aircraft)--Upon completion of inspection, units will forward
a priority message to: Apache War Room IAW para 16b. The report will cite this message number, date of
inspection, aircraft serial number, aircraft and compnent hours and results of the inspection. Inspection and
reports will be completed no later than 7 days after the task/inspection suspense date.
c.
Reporting compliance suspense date (spares)--
(1) Materiel in Wholesale Depot Storage -- Report receipt of this TB by e--mail or datafax to the
wholesale materiel (spares) point of contact listed in para 16C within 3 working days from the date of this TB.
Provide local point of contact.
7