TM 1-1520-238-23
1-82
1.26.
APU OIL SYSTEM DRAINING AND SERVICING continued
b. Secure panel (1).
(1) Position panel (1) over APU.
(2) Join hook and pile fasteners (2).
(3) Install four screws (3) through four washers
(4) into panel (1).
c. Secure access doors RN5, T250L, T250R,
T290L, T290R, and L325 (para 2.2).
END OF TASK
M04-1602-10
1
2
3
4
2