TM 1-1520-238-23
1-110
Change 5
1.35.
HYDRAULIC SYSTEM BLEED continued
c. Connect hydraulic pressure Y hoses (7) and
(8) to utility pressure coupling (9) and primary
pressure coupling (10).
(1) Remove cap (11) from utility pressure cou-
pling (9).
(2) Remove cap (12) from primary pressure cou-
pling (10).
(3) Connect pressure Y hose (7) to coupling
(9). Use hydraulic pressure Y hose (figure
D-466, App D).
(4) Connect pressure Y hose (8) to coupling
(10).
d. Connect AGPU return hose (13) to return Y
hose coupling (14).
(1) Remove cap (15) from Y hose coupling
(14).
(2) Turn coupling nut (16) clockwise until seated
and locking teeth engage fully with teeth on
Y hose coupling (14).
e. Connect AGPU pressure hose (17) to pres-
sure Y hose coupling (18).
(1) Remove cap (19) from Y hose coupling
(18).
(2) Turn coupling nut (20) clockwise until seated
and locking teeth engage fully with teeth on
Y hose coupling (18).
f. Enter pilot station (para 1.56). Observe all
safety precautions.
GO TO NEXT PAGE
11
9
7
M04-1611-21
8
M04-1611-28
10
12
M04-1611-29
15
13
17
20
16
18
14
19
