TM 1-1520-238-23
1-295
1.95.
HOISTING APU REMOVAL continued
NOTE
Use a tag line to control APU.
d. Tie 20-foot lines to forward and aft ends of
APU (7).
e. Lift APU (7) to relieve weight from APU
mounts.
f. Lift APU (7) from equipment bay deck after
disconnecting and demounting.
(1) Crank winch (6) to hoist APU (7) above deck
area access doors and fairing.
g. Position APU (7) over workstand (8).
(1) Rotate crane handle (3) to up position to al-
low lateral movement of boom arm (4).
(2) Use two tag lines (5) to move arm (4). Turn
boom arm (4) to aline APU over workstand
(8).
(3) Rotate handle (3) to the down position to pre-
vent lateral movement of boom arm (4).
h. Crank winch (6) and slowly lower APU (7) to
workstand (8).
(1) Mount APU (7) on workstand (8).
i. Crank winch (6) to provide cable slack below
lug (1).
j. Retract hook (2).
(1) Unsnap hook (2) from lug (1).
(2) Crank winch (6) to position hook (2) about 6
inches below boom sheave (9).
END OF TASK
M04-2252-2
4
8
9
5
2
1
7
6
3
VIEW ROTATED