TM 1-1520-238-23
Change 8
1-323
1.107.
MAIN ROTOR BLADES TIEDOWN REMOVAL
1.107.1. Description
This task covers:
Removal.
1.107.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Aircraft mooring tiedown kit (item 363, App H)
Personnel Required:
67R
Attack Helicopter Repairer
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
1.107.3. Removal
a. Release main rotor blade tiedown ropes (1)
and (2).
(1) Release right aft tiedown rope (1) from aft
jackpad (3).
(2) Release left aft tiedown rope (1) from catwalk
step (3.1).
(3) Release two tiedown ropes (2) from each for-
ward landing gear mooring point (4).
GO TO NEXT PAGE
4
3
M04-2106-1A
2
1
3.1