TM 1-1520-238-23
2-32
2.10.
PILOT/CPG COCKPIT THERMAL INSULATION AND HOOK AND PILE FASTENER
REMOVAL/INSTALLATION
2.10.1. Description
This task covers:
Removal. Cleaning. Inspection. Repair. Installation.
2.10.2. Initial Setup
Tools:
Airframe repairmans tool kit (item 377, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
12-inch bent trimmer shears (item 284, App H)
Materials/Parts:
Adhesive (item 18, App F)
Brush (item 34, App F)
Naphtha (item 127, App F)
Personnel Required:
68G
Aircraft Structural Repairer
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
NOTE
This task is typical for removing and
replacing thermal insulation panels.
Some thermal insulation panels may
have cutouts for electrical wiring,
screw ECS outlets, or defog tubing.
2.10.3. Removal
a. Enter pilot or CPG station (para 1.56). Observe
all safety precautions.
b. Remove thermal insulation (1).
(1) Separate hook and pile fasteners (2).
(2) Remove insulation (1) from bulkhead (3).
2.10.4. Cleaning
a. Wipe insulation and bulkhead with a clean
rag.
GO TO NEXT PAGE
M04-3355-1
M04-3355-2
3
1
2