TM 1-1520-238-23
Change 1
2-66.1/(2-66.2 blank)
2.26.
GROUNDING JACK REPLACEMENT continued
2.26.5. Inspection
a. Check fuselage for cracks and corrosion (para
2.11).
2.26.6. Installation
a. Install new jack (1) in fuselage (2).
(1) Install jack (1) through washer (5) and fuse-
lage (2).
(2) Hold jack (1). Install washer (4) and nut (3).
b. Perform electrical bond check on jack
(TM 55-1500-323-24).
(1) Bond shall be 1.00 OHM or less. Use
multimeter.
c. Apply sealing compound at mounting surface
of jack (1) and fuselage (2). Use brush (item 34,
App F) and sealing compound (item 175, App F).
d. Inspect (QA).
e. Install forward fuel cell if removed (para
10.28).
f. Install L/H or R/H wing trailing edge if removed
(para 2.122).
g. Install access panel R200 if removed (para
2.2).
END OF TASK