TM 1-1520-238-23
Change 1
2-65
2.26.
GROUNDING JACK REPLACEMENT
2.26.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
2.26.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Multimeter (item 215, App H)
Adjustable air filtering respirator (item 262, App H)
Materials/Parts:
Brush (item 34, App F)
Sealing compound (item 175, App F)
Personnel Required:
67R
Attack Helicopter Repairer
68X
Armament/Electrical System Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
References:
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.2
Access panel R200 removed (as required)
2.122
L/H or R/H wing trailing edge removed (as
required)
10.28
Forward fuel cell removed (as required)
GO TO NEXT PAGE