TM 1-1520-238-23
3-188
3.50.
TAIL LANDING GEAR WHEEL (WITHOUT GREASE FITTING) TIRE AND TUBE
REMOVAL/INSTALLATION continued
j. Check stem (5) and wheel (7) rim for leaks.
Use leak test compound (item 109, App F).
NOTE
This task is typical for eight-bolt or nine-
bolt wheels. If wheel is to be transported
or stored prior to installation, reduce air
pressure to 20 psi and tag assembly stat-
ing pressure.
k. Install cap (2) on stem (5).
l. Inspect (QA).
m. Install tail landing wheel and axle (para 3.49).
END OF TASK
M04-3433-6
5
2
7