TM 1-1520-238-23
2-152
2.54.
CPG STATION ACCESS DOOR REMOVAL/INSTALLATION
2.54.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
2.54.2. Initial Setup
Tools:
Airframe repairmans tool kit (item 377, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
Adjustable air filtering respirator (item 262, App H)
30 - 150 inch-pound 1/4-inch drive click type torque
wrench (item 435, App H)
Materials/Parts:
Cotter pin (2)
Packing
Cloth (item 52, App F)
Petrolatum (item 138, App F)
Tape (item 201, App F)
Tape (item 203, App F)
Wire (item 225, App F)
Personnel Required:
68G
Aircraft Structural Repairer
One person to assist
67R3F
Attack Helicopter Repairer/Technical
Inspector
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
NOTE
Position one person to support access
door during removal/installation.
2.54.3. Removal
a. Enter CPG station (para 1.56). Observe all
safety precautions.
GO TO NEXT PAGE
M04-1438-1