TM 1-1520-238-23
2-276
2.78.
FUSELAGE BOW HANDLE REMOVAL/INSTALLATION continued
2.78.3. Removal
a. Remove fuselage bow handle (1) from fuse-
lage (2).
(1) Remove screws (3) and washers (4) from
handle (1).
(2) Remove handle (1) from fuselage (2).
2.78.4. Cleaning
a. Wipe removed and attaching parts and sur-
faces with a clean rag.
2.78.5. Inspection
a. Check fuselage for damage (para 2.11).
b. Check handle for cracks and corrosion (para
2.11).
2.78.6. Installation
a. Install handle (1) on fuselage (2).
(1) Position handle (1) on fuselage (2).
(2) Install two screws (3) and washers (4).
b. Inspect (QA).
END OF TASK
M04-1476-2
4
3
1
4
3
2