TM 1-1520-238-23
2-384
Change 7
2.107.
VERTICAL STABILIZER REMOVAL/INSTALLATION continued
2.107.3. Removal
a. Detach connector P124 (1) from receptacle
J124 (2) on tailboom assembly (3).
b. Detach connector P756 (4) from receptacle
J756 (5) on tailboom (3).
c. Remove two loop clamps (6) from tailboom (3)
(two places).
(1) Remove two screws (7), self-locking nuts (8),
and washers (9) from clamps (6).
(2) Remove two clamps (6) from tailboom (3)
(two places).
d. Remove and discard tie strap (10).
NOTE
On aircraft modified with elastomeric
mounts the two vertical stabilizer hy-
draulic line assemblies are installed
with the 45 and 90 elbows at the
back of the vertical stabilizer hard
lines.
On aircraft that have not been modi-
fied with elastomeric mounts the two
vertical stabilizer hydraulic line assem-
blies are installed with the 45 and 90
elbows at the bracket on the F.S. 547
frame.
e. Remove two vertical stabilizer hydraulic line
coupling assemblies (11) from coupling
halves (12).
f. Remove two coupling assemblies (13) from
coupling halves (14).
GO TO NEXT PAGE
3
1
2
M04-2990-2
3
10
7
8
9
M04-2990-8A
6
5
4
M04-2990-10A
13
14
12
11
13
13
13
14
14
ADQ
13
14
14
13
ADR