TM 1-1520-238-23
4-162
Change 4
4.51.
NO. 1 ENGINE INSTALLATION UPPER CONNECTIONS continued
M04-2996-7A
j. Install cable (27) on power available spindle
gearbox (28).
(1) Remove cable (27) from upper clip (29).
(2) Install cable (27) on power available spindle
fitting (30).
(3) Install coupling nut (31).
k. Install cable (32) on load demand spindle
gearbox (33).
(1) Remove cable (32) from lower clip (34).
(2) Install cable (32) on load demand spindle fit-
ting (35).
(3) Install coupling nut (36).
GO TO NEXT PAGE
M04-2996-8
31
29
28
27
30
31
34
36
32
33
35
36