TM 1-1520-238-23
4-176
4.55.
NO. 2 ENGINE INSTALLATION UPPER CONNECTIONS continued
r. Install fuel hose (59) on receptacle (60).
(1) Aline ratchet sleeve (61) with adapter (62).
(2) Turn sleeve (61) clockwise until locking teeth
are fully engaged and seated.
s. Attach connector P60 (63) to receptacle J60
(64).
t. Attach connector P48 (65) to receptacle J48
(66).
u. Install wire harness (67) on airframe (68).
(1) Position clamp (68) on harness (67).
(2) Install screw (70) through washer (71), clamp
(69), and spacer (72) into airframe (68).
v. Inspect (QA).
w. Install No. 2 drive shaft (para 6.2).
x. Service No. 2 engine oil system (para 1.24).
y. Prime fuel system (para 1.23).
z. Secure access doors RN1, RN3, and RN4;
install panel R200 (para 2.2).
aa. Remove maintenance crane (para 1.105).
ab. Perform power plants maintenance operation-
al check (engine 2) (TM 1-1520-238-T).
END OF TASK
M04-2998-14
59
61
62
60
M04-2998-16
64
63
67
68
72
59
71
66
65
70