TM 1-1520-238-23
4-384
Change 4
4.121.
NO. 1 AND NO. 2 ENGINE INBOARD SECONDARY NOZZLE
REMOVAL/INSTALLATION
4.121.1. Description
This task covers:
Removal. Cleaning. Inspection. Repair. Installation.
4.121.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Light duty laboratory apron (item 27, App H)
Industrial faceshield (item 129, App H)
Chemical protective gloves (item 154, App H)
Materials/Parts:
Epoxy primer coating kit (item 77, App F)
Lubricating oil (item 118, App F)
Polyurethane coating (item 140, App F)
Wire (item 226, App F)
Personnel Required:
67R
Attack Helicopter Repairer
One person to assist
67R3F
Attack Helicopter Repairer/Technical
Inspector
References:
TM 55-1500-345-23
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
NOTE
This task is typical for No. 1 or No. 2
inboard secondary nozzle.
4.121.3. Removal
a. Remove strut (1) from inboard secondary
nozzle (2).
(1) Remove bolt (3) and washer (4).
b. Move strut (1) clear of nozzle (2).
(1) Loosen bolt (5).
(2) Swing strut (1) aft to clear.
GO TO NEXT PAGE
M04-1057-5
4
3
5
1
M04-1057-6
2
