TM 1-1520-238-23
4-452
4.141.
NO. 2 ENGINE POWER AVAILABLE SPINDLE GEARBOX REMOVAL/INSTALLATION continued
d. Enter pilot station (para 1.56). Observe all
safety precautions.
e. Set pilot No. 2 PWR lever (1) to OFF.
f. Install No. 2 engine load demand spindle gear-
box (para 4.144).
g. Perform No. 2 engine power available spindle
system rigging check (para 4.187).
h. Perform power plants maintenance operation-
al check (engine 2) (TM 1-1520-238-T).
i. Secure access door RN1 (para 2.2).
END OF TASK
1
M04-1177-10