TM 1-1520-238-23
Change 1
4-603
4.171.
NO. 1 ENGINE POWER AVAILABLE SPINDLE AFT CABLE INSTALLATION continued
g. Install support (22) on firewall (23).
(1) Aline support (22) on firewall (23).
(2) Install four screws (24) through support (22)
and firewall (23).
(3) Hold four screws (24). Install four washers
(25) and nuts (26).
h. Install clamps (27) and (28) on support (22).
(1) Install clamp (27) on cable (2).
(2) Install two screws (29) through clamps (27)
and (28) and support (22).
(3) Hold two screws (29). Install two washers
(30) and nuts (31).
i. Inspect (QA).
j. Perform No. 1 engine power available spindle
system rigging check (para 4.186).
k. Perform power plants maintenance operation-
al check (engine 1) (TM 1-1520-238-T).
l. Install panel L200 (para 2.2).
END OF TASK
22
M04-1200-8
24
25
23
26
27
29
28
22
31
M04-1200-9
30
29
2