TM 1-1520-238-23
7-72
Change 5
7.20.
PRIMARY HYDRAULIC GSE PANEL REMOVAL/INSTALLATION
7.20.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
7.20.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Airframe repairmans tool kit (item 377, App H)
Personnel Required:
67R
Attack Helicopter Repairer
68G
Aircraft Structural Repairer
67R3F
Attack Helicopter Repairer/Technical
Inspector
Materials/Parts:
Rivets (5)
References:
TM 1-1500-204-23
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
2.2
Access fairing T325 removed
7.3
Primary hydraulic system vented
7.57
Utility hydraulic system vented
7.22
Primary hydraulic GSE fill port nipple re-
moved
7.23
Primary hydraulic GSE pressure coupling
removed
7.24
Primary hydraulic GSE return coupling re-
moved
7.25
Hydraulic hand pump removed
NOTE
This task typical for primary hydraulic
GSE panel with or without filter bracket
installed.
GO TO NEXT PAGE
M04-760-1
M04-760-6A
E
R
P
R
FLUID FILL
PRIMARY
U
N
R
U
T
E
R
S
S
E
FLUID FILL
PRIMARY
ADF
ADG
N
R
U
T
E
R
E
R
P
R
U
S
S
E