TM 1-1520-238-23
7-83
7.23.
PRIMARY HYDRAULIC GSE PRESSURE COUPLING REPLACEMENT continued
7.23.3. Removal
a. Remove dust cap (1) from GSE pressure cou-
pling (2).
b. Remove pressure tube (3) from coupling (2).
(1) Place rags under nut (4) to catch hydraulic
fluid spills.
(2) Hold coupling (2). Remove nut (4).
c. Remove coupling (2) from GSE panel (5).
(1) Remove three screws (6), nuts (7), and wash-
ers (8).
(2) Remove coupling (2).
7.23.4. Cleaning
a. Wipe removed and attaching parts with a
clean rag.
7.23.5. Inspection
a. Check dust cap, tube, and nut for nicks,
cracks, and stripped or damaged threads
(para 7.1).
b. Check removed and attaching parts for corro-
sion (para 1.49).
GO TO NEXT PAGE
M04-756-2
4
5
2
7
8
1
6
3