TM 1-1520-238-23
7-84
7.23.
PRIMARY HYDRAULIC GSE PRESSURE COUPLING REPLACEMENT continued
7.23.6. Installation
a. Install new coupling (2) on panel (5).
(1) Insert and aline coupling (2) through panel
(5).
(2) Install three screws (6), washers (8), and nuts
(7).
b. Install tube (3) on coupling (2).
(1) Hold coupling (2). Install nut (4).
c. Inspect (QA).
d. Bleed primary hydraulic system (para 1.35).
e. Service primary hydraulic system (para 1.34).
f. Perform hydraulic system leak check (para
7.2).
g. Secure access door R325 (para 2.2).
END OF TASK
M04-756-5
3
4
8
6
7
3
4
6
5
2