TM 1-1520-238-23
9-127
9.36.
PILOT ELEC PWR PANEL GEN 1, GEN 2, OR BATT/EXT PWR SWITCHES
REPLACEMENT continued
b. Attach wires (1) to switch (2).
(1) Install screws (3) through lockwashers (4),
lugs (5), into switch (2).
c. Inspect (QA).
d. Install pilot ELEC PWR light indicating panel
(para 9.34).
e. Install pilot ELEC PWR panel (para 9.33).
f. If GEN 1 or GEN 2 switches were replaced,
perform AC electrical power generation main-
tenance operational check; if BATT/EXT PWR
switch was replaced, perform DC electrical
power generation maintenance operational
check (TM 1-1520-238-T).
END OF TASK