TM 1-1520-238-23
9-541
9.140.
DATA LINK TERMINATION UNIT (DLTU) (CPG STATION) REPLACEMENT continued
9.140.6. Installation
a. Install DLTU (15) on support bracket (16).
(1) Install two screws (17) through washers (18)
and DLTU (15) into bracket (16).
b. Perform
electrical
bond
check
(TM 55-1500-323-24).
(1) Bond shall be 0.0025 OHM or less. Use
ohmmeter.
c. Apply insulation compound around base of
DLTU (5). Use brush (item 34, App F) and
insulating compound kit (item 97, App F). Discard
brush in suitable container.
d. Attach connector P639 (3) to receptacle
(T11)J1 (4).
e. Attach P641 (5) connector to receptacle
(T13)J1 (6).
f. Attach P643 (7) connector to receptacle
(T15)J1 (8).
g. Attach P645 (9) connector to receptacle
(T17)J1 (10).
h. Attach P647 (11) connector to receptacle
(T19)J1 (12).
i. Attach P649 (13) connector to receptacle
(T21)J1 (14).
GO TO NEXT PAGE
3
4
15
6
10
17
18
12
11
9
8
5
M04-3074-5
16
14
7
13