TM 1-1520-238-23
9-539
9.140.
DATA LINK TERMINATION UNIT (DLTU) (CPG STATION) REPLACEMENT
9.140.1. Description
This task covers:
Removal. Cleaning. Inspection. Installation.
9.140.2. Initial Setup
Tools:
Aircraft mechanics tool kit (item 376, App H)
Electrical tool kit (item 378, App H)
Light duty laboratory apron (item 27, App H)
Chemical protective gloves (item 154, App H)
1 1/4-inch blade putty knife (item 199, App H)
Ohmmeter (item 218, App H)
Adjustable air filtering respirator (item 262, App H)
Materials/Parts:
Brush (item 34, App F)
Insulating compound kit (item 97, App F)
Personnel Required:
67R
Attack Helicopter Repairer
68X
Armament/Electrical System Repairer
68X3F
Armament/Electrical System Repairer/
Technical Inspector
References:
TM 9-1230-476-20-2
TM 55-1500-323-24
Equipment Conditions:
Ref
Condition
1.57
Helicopter safed
9.140.3. Removal
a. Enter CPG station (para 1.56). Observe all
safety precautions.
b. On CPG circuit breaker panel No. 1, open
seven MUX circuit breakers.
NOTE
This task is typical for DLTUs T11, T13,
T15, T17, T19, and T21.
c. Remove left forward console access panel (1).
(1) Remove 20 screws (2).
GO TO NEXT PAGE
CPG STATION
M04-3074-1
1
M04-3074-2
2